Skip to content

Website development stages: 8 steps from request to launch

What happens between a request and a finished website: eight steps, your role in each and how long it takes.

QD team 5 min read
Website development stages — the path from a request to a finished website

Website development stages are the sequence of steps from the first conversation to launch: research, contract, planning, prototype, design, development, testing and publishing. When you know these stages in advance, the project does not turn into a "black box": it is clear what is happening now, what is needed from you and when the result will be ready.

Below is how it works at QD studio. We work this way on every website: from a landing page to an online store. Only the amount of work at each step differs.

Why website development stages matter to you

A website built "in one go" almost always gets rebuilt. The designer draws beautiful screens, and then it turns out a delivery page is missing, the form doesn't fit your CRM and the texts don't fit the layout. Every such discovery at the end of a project costs three times more than at the beginning.

Clear stages solve three problems:

  • A predictable budget. The scope is fixed before the start, not "along the way".
  • Fewer revisions. You approve the structure and prototype before the design, so the design doesn't have to be redone.
  • Clear deadlines. Each stage has its own date, and you can see where the project is now.

Website development stages: from research to launch on one timeline

1. Research: what we are building and for whom

It all starts with your request — through the form on the website, by e-mail or in a messenger. We communicate in writing: that way every agreement is recorded immediately, and nothing gets lost after a call.

At this step we find out:

  • what problem the website should solve: leads, sales, trust, hiring;
  • who your customers are and what devices they use;
  • who your competitors are and how you differ from them;
  • what you already have: a logo, texts, photos, a domain, an old website.

Your role: answer the questions and send examples of websites you like (and don't). Time: 1–3 days.

2. Contract: price, deadlines, revision rules

After the research we suggest a format and an estimated cost. You can calculate it yourself in the calculator. Next comes the contract, which fixes:

  • the scope of work: pages, features, integrations;
  • the deadline for each stage;
  • the number of revision rounds;
  • the payment schedule (usually in parts, by stage).

Time: 1–2 days.

3. Planning and technical specification

At this stage of website development we create the structure — a map of all pages and the links between them — and the technical specification. The specification describes what each page must do: which blocks, forms, filters, integrations. More on this in the article "How to write a website specification".

Here we also plan SEO: which search queries each page will target, so that Google finds the website from day one rather than "we'll fix it later".

Your role: approve the structure. Time: 3–7 days.

4. Prototype: a skeleton without colours

A prototype is a scheme of the pages without colours or photos: where the heading goes, where the button is, where the form is, in what order the blocks come. On a prototype it is easy to rearrange blocks or add a new one — minutes of work, not days as in a finished design.

We make prototypes for desktop and mobile at the same time, because most visitors now come from a smartphone.

Your role: approve the page logic. Time: 3–10 days.

5. Design: style, colours, details

Once the skeleton is approved, the designer "dresses" it in your style: colours, fonts, photos, icons, animations. If you don't have a visual identity yet, we start with branding — otherwise the website would have to be repainted once a logo appears.

We check accessibility separately: text contrast, button size, visible keyboard focus. This is part of the design, not an "option" — we explain why in the article "Website accessibility".

Your role: approve the layouts, prepare texts and photos. Time: 1–3 weeks.

6. Development: front end and programming

Developers turn the layouts into a live website: front-end coding for all screens, an admin panel for editing, forms, payments, integrations with a CRM or delivery services. We work on our own CMS, QAdmin: it is fast, has no unnecessary plugins and makes it easy to edit texts yourself.

During development the website lives at a test address hidden from Google. You can open it and see how the work is progressing.

Time: 1–6 weeks depending on the features.

7. Testing: we check everything before launch

Before launch we check:

  • how it looks on phones, tablets and computers in different browsers;
  • loading speed (PageSpeed, Core Web Vitals);
  • forms and requests: whether e-mails arrive and the manager sees them;
  • accessibility: keyboard navigation, alt text, contrast;
  • the SEO basics: headings, descriptions, sitemap, redirects from the old website.

Your role: go through the website as a customer and write down everything that seemed odd. Time: 2–5 days.

8. Launch and the first weeks after it

Launch is not just "pressing a button". We move the website to your domain, turn on HTTPS, connect Google Search Console, submit pages for indexing and set up redirects if there was an old website.

After launch the website stays under supervision for a few more weeks: we check whether requests arrive, how Google indexes the pages, whether there are errors. Then — if you wish — support: updates, new pages, help with content.

Website launch: domain, HTTPS, Search Console and the first requests

How long website development takes overall

Website typeApproximate time
Landing page2–4 weeks
Corporate website4–8 weeks
Online store8–14 weeks

Most often the timeline slips not because of development but because of content: texts and photos that are prepared in parallel. So we ask you to start collecting materials already at the prototype stage.

Two more typical reasons for delays are long approvals inside the company (when five people need to see a layout) and new ideas in the middle of development. The first is solved by one responsible person on your side. The second by a "later" list: we will gladly add new features after launch without moving the date.

In short

The eight stages of website development — research, contract, planning, prototype, design, development, testing and launch — are a way to build a website once and build it well. You approve every step, see the progress and don't pay for rework. Ready to discuss your project? Write to us — we will reply with questions and an approximate plan.

#FAQ

How much does website development cost?

It depends on the type and features: a landing page starts at about $330 (UAH 15,000), a corporate website at about $870 (UAH 40,000), an online store at about $1,950 (UAH 90,000). You can get a more precise figure with the calculator on our website.

Can a stage be skipped to make it faster?

It can be shortened, but not skipped. For example, for a simple landing page the prototype and design can be combined. But without research and testing the website will almost certainly have to be rebuilt.

What do you need from me during development?

Answers to questions at the start, approval of the structure, prototype and design, plus texts and photos. The faster you approve the stages, the sooner the launch.

Can I edit the website myself after launch?

Yes. We hand over a convenient admin panel and show you how to change texts, photos and prices and add articles.

How do you communicate with clients?

Mostly in writing: e-mail, messengers, comments on layouts. That way all agreements are recorded and easy to come back to.

Branding23 November 2026

How to choose brand colours people remember

Colour is the first thing a person notices about a brand, even before the logo and the name. We explain how to choose a palette that sets you apart from competi…

5 min read